successfully won the bid for the metal ceiling project of Ningbo Lishe International Airport

Time: 2019-04-23


Project Name: Ningbo Lishe International Airport
Project Location: Ningbo


Project application product: metal ceiling


The T1 terminal of Ningbo Lishe International Airport has a total construction area of 43,500 square meters, 7 passenger boarding bridges, and an apron area of 142,000 square meters. There are 16 parking spaces, 7 of which are close to each other, and annual passenger throughput. 3.8 million people designed. The total investment of the third phase expansion project of Ningbo Lishe International Airport is 7.7 billion yuan, designed and constructed according to the annual passenger throughput of 12 million passengers and cargo and mail throughput of 500,000 tons.


It mainly builds a T1 terminal building of 104,000 square meters, a business jet terminal of 3,000 square meters, a freight station of 50,000 square meters, a express mail center of 14,000 square meters, and a tarmac of 412,000 square meters, etc. The floor area of the station has been expanded by 2.5 times and the area of the apron has been expanded by nearly three times.
[] Runway Ningbo Lishe International Airport has a runway length of 3,200 meters and a width of 60 meters.
[] Navigation System Ningbo Lishe International Airport is equipped with advanced communication navigation and navigation control equipment. The flight support capacity is 20 sorties/hour. It can take off and land MD82, Airbus A320, Boeing 737, Boeing 757, Boeing 747, etc. Medium passenger aircraft.